Fernando Alonso must start the Belgian GP from the back of the grid after exceeding the allowed number of Power Unit elements.

Explanation

Fernando Alonso (Car 14) used a 5th Energy Store, 5th Control Electronics unit, and 7th Power Unit Ancillary component in Free Practice 3, exceeding the seasonal allowance. Per Article B8.2.8, this incurs 5 grid places for each of the ES and CE elements and 10 grid places for the ancillary component, totalling 20 grid places. Since this exceeds 15 cumulative grid penalties, Article B2.5.4b.iv requires a start from the back of the grid.

Full document

Scrollable preview inside the frame

Open in new tab

Loading PDF…

FIA F1 Regulations - Article B8.2.2
B8.2.2 In each Championship, unless a driver drives for more than one (1) Competitor (Article B8.2.7), and subject to the additions described below, each driver may use no more than: a. 3 engines (ICE): an engine, for the purposes of this Article, will be considered to be all the components respectively listed as “ICE” and “INC” in the “PU Element” and “Sealed Perimeter” Columns in Appendix C4, with the exception of the components considered as PU- ANC below. b. 3 turbochargers (TC): a turbocharger, for the purposes of this Article, will be considered to be all the components respectively listed as “TC” and “INC” in the “PU Element” and “Sealed Perimeter” Columns in Appendix C4. c. 3 exhaust sets (EXH): an exhaust set, for the purposes of this Article, will be considered to be all the components respectively listed as “EXH” and “INC” in the “PU Element” and “Sealed Perimeter” Columns in Appendix C4, with the exception of the components considered as PU- ANC below. The four elements constituting an Exhaust set, deemed to be the left-hand primaries, right-hand primaries, left hand secondary, right hand secondary, will be considered separately for the purposes of this Article. d. 2 energy store units (ES) : an energy store, for the purposes of this Article, will be considered to be all the components listed as “ES” and “INC” in the “PU Element” and “Sealed Perimeter” Columns in Appendix C4. 2026 Form ula 1: Sporting Regulations 27 February 2026 B 0 SECTION B: SPORTING REGULATIONS e. 2 of each control electronics units (PU-CE): a control electronics unit, for the purposes of this Article, will be considered to be any of the components listed as “PU-CE” and “INC” in the “PU Element” and “Sealed Perimeter” Columns in Appendix C4, with the exception of the components considered as PU-ANC below. f. 2 MGU-K: MGU-K, for the purposes of this Article, will be considered to be all the components respectively listed as “MGUK” and “INC” in the “PU Element” and “Sealed Perimeter” Columns in Appendix C4. g. 5 of each Power Unit ancillary components (PU-ANC): a Power Unit ancillary component, for the purposes of this Article, will be considered to be any of the components listed as “YES” in the “PU-ANC” column in Appendix C4. B8.2.3 Each driver will be permitted to use an additional unit for each of the Power Unit elements listed in
Open regulation PDF Pages 65–66 highlighted
FIA F1 Regulations - Article B8.2.8
B8.2.8 Should a driver use more Power Unit elements than the numbers prescribed in Articles B8.2.2, B8.2.3 and B8.2.4 of any one of the elements during a Championship, a grid place penalty will be
Open regulation PDF Pages 66 highlighted
FIA F1 Regulations - Article B8.2.8b Open regulation PDF Pages 66 highlighted
FIA F1 Regulations - Article B8.2.8a Open regulation PDF Pages 66 highlighted
FIA F1 Regulations - Article B2.5.4.biv